Change Number: Change 178 GSAR Case 2020-G511
Effective Date: 03/25/2024

536.7104 Construction Contract Award.

536.7104 Construction Contract Award.

In accordance with FAR 4.1001, the contracting officer shall use the SF 1442 to identify the services or supplies to be acquired as separately identified line items on a unit price or lump sum basis including the design phase services, the construction work GMP option(s), and any other work not included in the previously identified items.