Skip to main content
GSAM

GSAM

Change Number: Change 182 GSAM Case 2020-G514
Effective Date: 07/02/2024

514.407-4 Mistakes after award.

514.407-4 Mistakes after award.

The contracting director and assigned counsel are required to review and approve the contracting officer’s determinations under FAR 14.407-4(b) and (c).