DFARSPGI

DFARSPGI

Change Number: DFARS PGI Change 08/26/2022
Effective Date: 08/26/2022

PGI Defense Federal Acquisition Regulation

PGI Part 213 - SIMPLIFIED ACQUISITIONPROCEDURES

PGI Part 215 - CONTRACTING BY NEGOTIATION

      PGI 215.1 -SOURCE SELECTION PROCESSES AND TECHNIQUES

           PGI 215.101 RESERVED

                PGI 215.101-2-70 Limitationsand prohibitions.

      PGI 215.3 -SOURCE SELECTION

           PGI 215.300 -Scope of subpart.

           PGI 215.303 Responsibilities.

           PGI 215.304 Evaluation factors and significant subfactors.

           PGI 215.370 Evaluation factor for employing or subcontracting with members of the Selected Reserve.

                PGI 215.370-2 Evaluation factor.

           PGI 215.371 Only one offer.

                PGI 215.371-2 Promote competition.

      PGI 215.4 -CONTRACT PRICING

           PGI 215.402 Pricing policy.

           PGI 215.403 Obtaining certified cost or pricing data.

                PGI 215.403-1 Prohibition onobtaining certified cost or pricing data (10 U.S.C. 2306a and 41U.S.C. chapter 35).

                PGI 215.403-3 Requiring dataother than certified cost or pricing data.

           PGI 215.404 Proposal analysis.

                PGI 215.404-1 Proposal analysistechniques.

                PGI 215.404-2 Data to support proposal analysis.

                PGI 215.404-3 Subcontract pricing considerations.

                PGI 215.404-70 DD Form 1547, Record of Weighted Guidelines Method Application.

                PGI 215.404-71 Weighted guidelines method.

                PGI 215.404-71-4 Facilities capital employed.

           PGI 215.406 RESERVED

                PGI 215.406-1 Prenegotiationobjectives.

                PGI 215.406-2 Prenegotiationobjectives.

                PGI 215.406-3 Documenting the negotiation.

           PGI 215.407 RESERVED

                PGI 215.407-2 Make-or-buy programs.

                PGI 215.407-4 Should-cost review.

                PGI 215.407-5 Estimating systems.

                     PGI 215.407-5-70 Disclosure, maintenance, and review requirements.

           PGI 215.470 Estimated data prices.

PGI Part 216 - TYPES OF CONTRACTS

PGI Part 217 - SPECIAL CONTRACTING METHODS

      PGI 217.1 -MULTIYEAR CONTRACTING

           PGI 217.174 Multiyear contractsfor electricity from renewable energy sources.

      PGI 217.2 -OPTIONS

           PGI 217.202 Use of options.

           PGI 217.207 Exercise of options.

      PGI 217.5 -INTERAGENCY ACQUISITIONS

           PGI 217.502 Procedures.

                PGI 217.502-1 General.

           PGI 217.7 - Interagency Acquisitions: Acquisitions by Nondefense Agencies on Behalf of the Department of Defense

           PGI 217.770 Procedures.

      PGI 217.71 -MASTER AGREEMENT FOR REPAIR AND ALTERATION OF VESSELS

           PGI 217.7103 Master agreements and job orders.

                PGI 217.7103-1 Content andformat of master agreements.

                PGI 217.7103-3 Solicitations for job orders.

                PGI 217.7103-4 Emergency work.

                PGI 217.7103-5 Repair costs not readily ascertainable.

      PGI 217.74 -UNDEFINITIZED CONTRACT ACTIONS

           PGI 217.7404 RESERVED

                PGI 217.7404-1 Authorization.

                PGI 217.7404-2 Price ceiling.

                PGI 217.7404-3 Definitization schedule.

                PGI 217.7404-6 Allowable profit.

           PGI 217.7405 Plans and reports.

      PGI 217.75 -ACQUISITION OF REPLENISHMENT PARTS

           PGI 217.7503 Spares acquisition integrated with production.

           PGI 217.7504 Acquisition of parts when data is not available.

           PGI 217.7506 -SPARE PARTS BREAKOUT PROGRAM

                SPARE_PART_1 -GENERAL

                     1-101 Applicability.

                     1-103 Definitions.

                          1-103.1 Acquisition method code (AMC).

                          1-103.2 Acquisition method code conference.

                          1-103.3 Acquisition method suffix code (AMSC).

                          1-103.4 Actual manufacturer.

                          1-103.5 Altered item drawing.

                          1-103.6 Annual buy quantity.

                          1-103.7 Annual buy value (ABV).

                          1-103.8 Bailment.

                          1-103.9 Breakout.

                          1-103.10 Competition.

                          1-103.11 Contractor technical information code (CTIC).

                          1-103.12 Design control activity.

                          1-103.13 Direct purchase.

                          1-103.14 Engineering drawings.

                          1-103.15 Extended dollar value.

                          1-103.16 Full and open competition.

                          1-103.17 Full screening.

                          1-103.18 Immediate (live) buy.

                          1-103.19 Life cycle buy value.

                          1-103.20 Limited competition.

                          1-103.21 Limited screening.

                          1-103.22 Manufacture.

                          1-103.23 Prime contractor.

                          1-103.24 Provisioning.

                          1-103.25 Qualification.

                          1-103.26 Replenishment part.

                          1-103.27 Reverse engineering.

                          1-103.28 Selected item drawing.

                          1-103.29 Source.

                          1-103.30 Source approval.

                          1-103.31 Source control drawing.

                          1-103.32 Technical data.

                     1-104 General policies.

                     1-105 Responsibilities.

                SPARE_PART_2 -BREAKOUT CODING

                     2-200 Scope.

                     2-201 Coding.

                          2-201.1 Acquisition method codes.

                          2-201.2 Acquisition method suffix codes.

                          2-201.3 Contractor technical information codes.

                     2-202 Assignment of codes.

                     2-203 Improving part status.

                     2-204 Communication of codes.

                          2-204.1 Communication media.

                          2-204.2 Responsibilities.

                SPARE_PART_3 -IDENTIFICATION, SELECTION, AND SCREENING OF PARTS

                     3-300 General.

                     3-301 Identification and selection procedures.

                          3-301.1 Parts entering the inventory.

                          3-301.2 Annual buy forecasts.

                          3-301.3 Immediate buy requirements.

                          3-301.4 Suspect AMC/AMSC.

                     3-302 Screening.

                     3-303 Full screening procedures.

                          3-303.1 Data collection phase (step 1).

                          3-303.2 Data evaluation phase (steps 2-14).

                          3-303.3 Data completion phase (steps 15-21).

                          3-303.4 Technical evaluation phase (steps 22-37).

                          3-303.5 Economic evaluation phase (steps 38-56).

                          3-303.6 Supply feedback phase (steps 57-65).

                     3-304 Limited screening procedures.

                SPARE_PART_4 -CONTRACTOR'S ASSISTANCE

                     4-400 General.

                     4-401 Contractor's technical evaluation procedures.

                SPARE_PART_5 -REPORTING SYSTEM

                     5-500 General.

                     5-501 Reports.

                     5-502 Reporting procedures.

                     5-503 Reporting instructions.

      PGI 217.76 -CONTRACTS WITH PROVISIONING REQUIREMENTS

           PGI 217.7601 Provisioning.

      PGI 217.77 -OVER AND ABOVE WORK

           PGI 217.7701 Procedures.

      PGI 217.78 DELETED(NO CURRENT PGI TEXT)

PGI 217.78 DELETED(NO CURRENT PGI TEXT)

No current PGI text.