Skip to main content
HTML

AGAR

Part Number: 422

Agriculture Acquisition Regulation

Subpart 422.4—Labor Standards for Contracts Involving Construction

Subpart 422.4—Labor Standards for Contracts Involving Construction

422.404 Construction Wage Rate Requirements statute wage determinations.

422.404-6 Modifications of wage determinations.

The Mission Area senior contracting official is authorized to process the request for extension of the 90-day period for award after bid opening as provided in FAR 22.404-6(b)(6).

422.406 Administration and enforcement.

422.406-8 Investigations.

The HCA is authorized to submit reports of violations to the agency head in accordance with FAR 22.406-8(d).