APPENDIX F - MATERIAL INSPECTION AND RECEIVING REPORT
Part 2 -CONTRACT QUALITY ASSURANCE ON SHIPMENTS BETWEEN CONTRACTORS
F-301 Preparation instructions.
F-302 Mode/method of shipment codes.
F-304 Correction instructions.
F-306 Packing list instructions.
Part 4 -PREPARATION OF THE DD FORM 250 AND DD FORM 250C
F-401 Preparation instructions.
F-402 Mode/method of shipment codes. See paragraph F302.
F-404 Multiple consignee instructions.
F-405 Correction instructions.
F-407 Packing list instructions.
Part 5 -DISTRIBUTION OF WIDE AREA WORKFLOW RECEIVING REPORT (WAWF RR), DD FORM 250 AND DD FORM 250C
F-501 Distribution of WAWF RR.
F- 502 Distribution of DD FORM 250 AND DD FORM 250C.
Part 6 -PREPARATION OF THE DD FORM 250-1 (LOADING REPORT)
Part 7 -PREPARATION OF THE DD FORM 250-1 (DISCHARGE REPORT)