APPENDIX F —MATERIAL INSPECTION AND RECEIVING REPORT

      PART 1—INTRODUCTION

           F-101 General.

           F-102 Applicability.

           F-103 Use.

           F-104 Application.

      PART 2—CONTRACT QUALITY ASSURANCE ON SHIPMENTS BETWEEN CONTRACTORS

           F-201 Procedures.

      PART 3—PREPARATION OF THE WIDE AREA WORKFLOW (WAWF) RECEIVING REPORT (RR), WAWF REPARABLE RECEIVING REPORT (WAWF RRR), AND WAWF ENERGY RR

           F-301 Preparation instructions.

           F-302 Mode/method of shipment codes.

           F-303 Consolidated shipments.

           F-304 Correction instructions.

           F-305 Invoice instructions.

           F-306 Packing list instructions.

           F-307 Receiving instructions.

      PART 4—PREPARATION OF THE DD FORM 250 AND DD FORM 250C

           F-401 Preparation instructions.

           F-402 Mode/method of shipment codes. See paragraph F302.

           F-403 Consolidated shipments.

           F-404 Multiple consignee instructions.

           F-405 Correction instructions.

           F-406 Invoice instructions.

           F-407 Packing list instructions.

           F-408 Receiving instructions.

      PART 5—DISTRIBUTION OF WIDE AREA WORKFLOW RECEIVING REPORT (WAWF RR), DD FORM 250 AND DD FORM 250C

           F-501 Distribution of WAWF RR.

           F- 502 Distribution of DD FORM 250 AND DD FORM 250C.

      PART 6—PREPARATION OF THE DD FORM 250-1 (LOADING REPORT)

           F-601 Instructions.

      PART 7—PREPARATION OF THE DD FORM 250-1 (DISCHARGE REPORT)

           F-701 Instructions.

      PART 8—DISTRIBUTION OF THE DD FORM 250-1

           F-801 Distribution.

           F-802 Corrected DD Form 250-1.