Subpart 5336.3 - TWO-PHASE DESIGN-BUILD SELECTION PROCEDURES
5336.301 Use of Two-Phase Design-Build Selection Procedures
(b)(3)(vi) See MP5301.601 (a)(i) Head of the Contracting Activity (HCA) Matrix.
5336.303-1 Phase One
(a)(4)(i)(B)See MP5301.601 (a)(i) Head of the Contracting Activity (HCA) Matrix.