1536.201 Evaluation of contracting performance.
1536.209 Construction contracts with architect-engineer firms.
Subpart 1536.5—Contract Clauses
1536.521 Specifications and drawings for construction.
Subpart 1536.6—Architect-Engineer Services
1536.602 Selection of firms for architect-engineer contracts.
1536.602-2 Establishment of evaluation boards.
Authority: 5 U.S.C. 301; Sec. 205(c), 63 Stat. 390, as amended, 40 U.S.C. 486(c); and 41 U.S.C. 418b.
Source: 49 FR 8863, Mar. 8, 1984, unless otherwise noted.
Subpart 1536.2—Special Aspects of Contracting for Construction
1536.201 Evaluation of contracting performance.
(a) The Contracting Officer will obtain input from the Project Officer on the contractor's performance. The Contracting Officer will prepare the contractor performance report as prescribed in FAR 36.201 within two weeks after final acceptance of the work or contract termination.
(b) Prior to submitting any report or unsatisfactory performance to the reviewing official, the Contracting Officer will advise the contractor of any proposed unsatisfactory rating (see FAR 36.201(a)(3)).
(c) The official at one level above the Contracting Officer will review each performance report.
(d) The Contracting Officer will forward the original of the performance report to the Quality Assurance Branch, Office of Acquisition Management. The Quality Assurance Section will file the form in the contractor performance evaluation files which it maintains.
(e) The Quality Assurance Branch will review the report when it is received and compare it with recent evaluations of that contractor. If the Quality Assurance Section discerns a pattern of unsatisfactory performance, it will notify the Contracting Officer for possible action, which may include referral of the matter to the Compliance Staff or to the Inspector General for investigation.
(f) Information from the performance report shall not be released outside of the Agency, except to other Government agencies at their written request, and on condition that the information will not be made available outside the Government. Requests from non-Government sources for information from performance reports shall be processed in accordance with EPA's Freedom of Information Act procedures at 40 CFR part 2.
[49 FR 8863, Mar. 8, 1984, as amended at 59 FR 18977, Apr. 21, 1994]
1536.209 Construction contracts with architect-engineer firms.
(a) The provisions of FAR 36.209 do not apply to subcontractors performing treatability studies.
(b) The provisions of FAR 36.209 also do not apply to subcontractors whose input during the design phase does not substantially affect the course of the design work.
(c) Approval under FAR 36.209 is not required for subcontractors under paragraph (a) or (b) of this section. Approval for all other subcontractors and prime contractors may be granted by the CCO. In reviewing requests for approval, the RAD shall consider factors such as the availability of other firms to perform the necessary construction or Superfund remedial action work, the estimated cost to the Government, and the policy of the Agency to promote the use of innovative technology.
[55 FR 49283, Nov. 27, 1990, as amended at 59 FR 18977, Apr. 21, 1994]
Subpart 1536.5—Contract Clauses
1536.521 Specifications and drawings for construction.
The Contracting Officer shall insert the clause at 1552.236–70, Samples and Certificates, in soliciations and contracts when a fixed price construction contract is expected to exceed the small purchase limitation. The clause may be inserted in solicitations and contracts when the contract is expected to be within the small purchase limitation.
Subpart 1536.6—Architect-Engineer Services
1536.602 Selection of firms for architect-engineer contracts.
1536.602-2 Establishment of evaluation boards.
(a) The Environmental Protection Agency Architect-Engineer Evaluation Board is established as a central permanent Board located at Headquarters EPA under authority delegated to the Director, Office of Acquisition Management, which may be re-delegated.
(b) The Service Center Manager (SCM) is delegated the authority to appoint either one or two additional voting members as may be appropriate for a particular project.
(c) In the event of an emergency or extended absence, a member may designate, in writing, with the concurrence of the Chairperson, an alternate experienced in architecture, engineering, or construction to serve in his/her absence.
(d) The duties of the advisory member shall include, but not be limited to, the following:
(1) Assuring that the criteria set forth in the public notice are applied in the evaluation process; and
(2) Assuring that actions taken during the evaluation process do not compromise subsequent procurement actions.