PART 5842 - CONTRACT ADMINISTRATION AND AUDIT SERVICES
Revised: April 2024
SUBPART 5842.15 – CONTRACTOR PERFORMANCE INFORMATION
5842.1502 Policy
(a) Documents to assist with Contractor Performance Assessment Reporting System (CPARS) to include the DISA CPARS Procedures are located at https://dod365.sharepoint-mil.us/sites/disa-PL2/SitePages/PL2-CPARS.aspx. Current Guidance for CPARS and the User Manual are available at https://www.cpars.gov/help.htm .
5842.1503 Procedures
(a)(1)(i) Past performance assessments are a combined responsibility of the Assessing Official (AO) Assessing Official Representative (AOR), Reviewing Official (RO), and Contractor Representative (CR).
(a)(1)(ii) The contracting officer shall be assigned as the AO. The RO is at least a level above the AO. The contracting officer and Focal Point (PSD Contract Specialist) appoint AORs (Contracting Officer’s Representative (COR) or Program Office Representatives) to assist the AO with writing the evaluation. If the AOR is the COR, the AOR designation shall be included in the COR appointment letter.