2816.601 Time-and-materials contracts.
The BPC, or designee at a level at or above the chief of the contracting office, is the agency official authorized to approve a determination and finding prescribed in FAR 16.601(d)(1)(ii).
The BPC, or designee at a level at or above the chief of the contracting office, is the agency official authorized to approve a determination and finding prescribed in FAR 16.601(d)(1)(ii).