Subpart 422.4 - Labor Standards for Contracts Involving Construction
422.404 Davis-Bacon Act wage determinations.
422.404-6 Modifications of wage determinations.
HCA's are authorized to request extension of the 90 day period for award after bid opening as provided in FAR 22.404-6(b)(6).
422.406 Administration and enforcement.
422.406.8 Investigations.
Reports of violations shall be forwarded to the HCA, who shall process such reports in accordance with FAR 22.406-8(d).