PART 5336 -
Construction and Architect-Engineer Contracts
2019 Edition
Revised: 2 May 2022
Table of Contents
PART 5336 - Construction and Architect-Engineer Contracts 1
SUBPART 5336.2 – SPECIAL ASPECTS OF CONTRACTING FOR CONSTRUCTION 1
5336.208 Concurrent Performance of Firm-Fixed-Price and Other Types of Construction Contracts 1
5336.209 Construction Contracts with Architect-Engineer Firms 2
5336.213-2 Presolicitation Notices 2
5336.272 Prequalification of Sources 2
SUBPART 5336.3 – TWO-PHASE DESIGN-BUILD SELECTION PROCEDURES 2
5336.301 Use of Two-Phase Design-Build Selection Procedures 2
SUBPART 5336.5 – CONTRACT CLAUSES 2
5336.507 Permits and Responsibilities 2
5336.570 Additional Provisions and Clauses 2
SUBPART 5336.6 – ARCHITECT-ENGINEER SERVICES 2
5336.602-3 Evaluation Board Functions 2
5336.609-1 Design Within Funding Limitations 3
SUBPART 5336.2 – SPECIAL ASPECTS OF CONTRACTING FOR CONSTRUCTION
5336.208 Concurrent Performance of Firm-Fixed-Price and Other Types of Construction Contracts
See MP5301.601(a)(i).
5336.209 Construction Contracts with Architect-Engineer Firms
Submit requests through the SCO to SAF/AQC for approval.
5336.213-2 Presolicitation Notices
(a) See MP5301.601(a)(i).
5336.272 Prequalification of Sources
(b) See MP5301.601(a)(i).
SUBPART 5336.3 – TWO-PHASE DESIGN-BUILD SELECTION PROCEDURES
5336.301 Use of Two-Phase Design-Build Selection Procedures
(b)(3)(vi) See MP5301.601(a)(i).
5336.303-1 Phase One
(a)(4)(i)(B) See MP5301.601(a)(i).
SUBPART 5336.5 – CONTRACT CLAUSES
5336.507 Permits and Responsibilities
When the clause at FAR 52.236-7, Permits and Responsibilities, is used in solicitations and contracts OCONUS, the clause must be modified to reflect “host government and political subdivisions” in lieu of “Federal, State, and Municipal.”
5336.570 Additional Provisions and Clauses
(b)(2) See MP5301.601(a)(i).
SUBPART 5336.6 – ARCHITECT-ENGINEER SERVICES
5336.602-3 Evaluation Board Functions
See MP5301.601(a)(i).
5336.609-1 Design Within Funding Limitations
(c)(1) See MP5301.601(a)(i).